Ten minutes from town and growing fast, with plenty of new acreage blocks that need storage before they need a shed.
Around Walkerston it's mostly building materials during a house build, and long-term acreage storage. Whatever the job, the process doesn't change: one call, one delivered price with the freight in it, and the right truck matched to your access.
| Container | Used from | New from |
|---|---|---|
| 10ft Containers | $4,350 | $6,400 |
| 20ft Containers | $2,200 | $3,300 |
| 40ft Containers | $2,600 | $5,500 |
Guide pricing only — what you pay delivered depends on where you are and what's in the yard that week. Ring (07) 4944 2211 and we'll give you a real number, not a range. Freight to Walkerston is quoted with the container, so the number you're given is the number you pay.

Walkerston sits just west of Mackay on the Peak Downs Highway. It's a country town that has become one of the region's most popular places to buy a few acres close to the city. Many of the containers we deliver here go onto new blocks where the owners are building a house, and the container is the first structure on the property.
The pattern is familiar. The block is bought, the slab isn't down yet, and there's nowhere secure to keep tools, the builder's materials or the household gear that's come out of a rental. A container arrives, does that job through the build, and then usually stays as the mower shed, the workshop or the home of the camping and fishing gear.
The highway also brings trades and transport businesses to the area. Mining services contractors heading west and small operators who want a yard outside the city use containers as secure stores on rural-residential and light-industrial land.
Access on a new acreage block is usually generous, but the ground isn't always ready. Freshly cleared or filled building pads can be soft, especially after rain, and a truck that tips a container onto new fill can leave ruts the earthmover then has to fix. If the house pad is being prepared, put the container somewhere the builder won't need later, on ground that has settled.
Talk to your builder before choosing the spot. Put the container where the concrete truck, the frame delivery and the scaffold won't need to go, but close enough that tools and materials don't have to be carried a long way. Keep it clear of where the septic, the water tanks and the power trench will run.
On established acreage, the usual checks apply: a straight approach, around 3.5 metres of width through the gate, firm ground and nothing low overhead. A tilt-tray handles most Walkerston jobs, and a sidelifter can place a 40ft where there's room.
For most acreage owners a 20ft is the right starting size: large enough for household overflow during the build, and afterwards for the ride-on, the trailer gear and tools. If you're already picturing a workshop, a high cube gives the headroom for a bench and shelving you can stand at. A 40ft suits people with machinery, a boat or a hobby that takes up space.
Some owners go further and turn a container into a studio or a granny-flat-style cabin. That's possible, but it needs council and building approvals and has to meet the local wind rating. Read the honest version on container homes and cabins before planning anything habitable.
Hire is a sensible way to start if you only need storage for the build. Hire units are cargo-worthy grade, wind and watertight, and if you decide to keep the container once the house is finished, we can talk about a buy-out so it doesn't have to be swapped. If you already know it's staying, buying from the start usually costs less.
As-is units are an option for rough storage but are sold as seen and not sold watertight, so they're not the choice for furniture or anything that has to stay dry during a wet-season build. The sales and hire page covers the comparison.
Walkerston is on our regular city truck runs, and deliveries are straightforward to arrange. Freight is quoted with the container, based on your address and access, so the delivered price is the price you pay. The day is confirmed when you order.
If the block is mid-build, a photo of the site layout and a word from the builder about where the container should go will save time on the day. Our delivery access guide covers what the truck needs.
Somewhere on settled ground that the concrete truck, frame delivery and scaffold won't need, and clear of future septic, tanks and service trenches. Ask your builder before choosing the spot.
Yes. If you decide to keep a hired container once the build is done, we can talk about a buy-out rather than swapping units.
It's possible, but habitable use needs council and building approvals and must meet the local wind rating. Check with Mackay Regional Council before starting.
Usually a tilt-tray for 10ft and 20ft containers and a sidelifter for 40fts. Send photos of the gate and drop spot and we'll confirm.
Te Kowai, Alexandra, Racecourse, Pleystowe, Balnagowan, Ooralea, Bakers Creek. Same process, same delivered price structure: tell us the address and we'll work out the truck.
Size, grade, freight and timing sorted in a single conversation.